Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2017-08-08 02:32
78
Company Profile
Qingdao Jieruixin Int'l Trading Co., Ltd.By certification [File Integrity]
Contact:Mr. Eric Qi(Mr.)
Email:
Telephone:
Phone:
Area:Shandong
Address:Shandong
Website: http://jieruixin.better-elec.com/
2.Main structure
1. cylinder part: 1500mm×2250mm stainless steel wire mould(1pc), Cylinder mould pressure forming machine (1 set),450mm×2250mm couch roll(1 pc),rubber HSD38°±2
2. Dryer part: 2500mm×2250mm Dryer ( 1 pc ), 500mm×2250mm carrier roller( 1 pc ), 300mm×2250mm wringing roll(2 pcs),including all the felt carrying rolls,air-powered pressure device,rubber HSD 90°±2, equiped with double-layer exhaust bood on the dryer.
3.Winding part:1000mm×2250mm sweat cylinder (1pc),280mm×2250mm fly rubber roll( 1pc ).rubber HSD75°±2. winding on the sweat cylinder. Equipped with the 250 speed reducer(1 set)
4. Rewinding and cutting part: matching 1880mm rewinding and perforating machine,toilet roll cutting machine..
5. Drive and control part: adopting AC frequency conversion speed, drive step by step.
Raw material: | recycled paper,wood pulpboard |
Output paper: | High & medium grade of toilet paper,tissue paper |
Output weight: | 13-30g/m2 |
Net width: | 1880mm |
Wire width: | 2250mm |
Capacity: | 5-6T/D |
Rail guage: | 3000mm |
Speed : | 150m/min |
Design type: | Box type,Back - stirring type |
Design Standards: | CNS Export equipment |
Our serve:Your satisfaction is our service purpose | ||
1 | Reasonable suggestions for selection of equipment | |
2 | Professional product's design to meet your equipment needs. | |
3 | Provide detailed configuration of the equipment instruction and equipment assembly drawings, to make you more aware of the device's ability to work. | |
4 | Transportation Service. | |
5 | Engineers on-site equipment installation and commissioning | |
6 | Provide training for your employees | |
7 | Professional technical guidance and technical support during your production, make sure the device's function properly | |
8 | Equipment upgrade & remould | |
9 | Engineer can go to your factory when you need | |
10 | Guidance of maintenance for equipments |