Hla551c-Wj-50 Type Fracis Micro Water Turbine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-28 08:39

  • Browse the number:

    336

Send an inquiries

Company Profile

Jiangsu Aerospace Hydraulic Equipments Co., Ltd.

By certification [File Integrity]

Contact:Ms. julie zhu(Mr.)  

Email:

Telephone:

Phone:

Area:Jiangsu

Address:Jiangsu

Website: http://aerospace.better-elec.com/

Product details
Francis Turbine

Francis turbine fits for the condition of head between 20m and 400m.The structure of this unit with mature technique and reliable operation is compact and it has high efficiency. So it is the main unit in China.
Generally speaking ,it is metal spiral case and the hydraulic flow state is good .We can provide you the single unit capacity ≤100MW.


 
Turbine Governor Main valve Generator
Type Head
(m)
Discharge
(m3/s)
Speed
(rpm)
Power
(kW)
Regulation Work
(kgm)
Diameter
(mm)
Diameter
(mm)
Press
(Mpa)
Seat No.
HLHT100-WJ-60 ≤45 2.18~2.97 600~1000 400~1000 300~600   800 6 1180
HLHT100-WJ-71 ≤45 2.9~3.69 500~750 500~1000 600~1000   1000 6 1430
HLHT100-WJ-84 ≤45 3.68~5.4 375~500 500~1600 600~1000   1250 6 1430~1730
HLHT100-LJ-100 ≤45 4.89~7.8 300~428.6 630~2500 600~1800   1500~1750 6 2150
HLHT100-LJ-120 ≤45 7.34~10.71 250~375 1000~3200 1000~3000   1750 6 2150~2600
HLHT100-LJ-140 ≤45 9.69~15.22 214.3~333.3 1250~5000 1800~5000   2000 6 2600~3250
HLHT100-LJ-160 ≤45 12.54~19.57 187.5~300 1600~6300 3000~ 100 2250 6 3250
HLHT100-LJ-180 ≤45 16.27~23.63 166.7~250 2000~6300   100 2500 6 3250
HLHT100-LJ-200 ≤45 19.34~30.58 150~214.3 2500~10000   100 3400 6 3250~4250
HLHT100-LJ-225 ≤45 24.55~38.49 125~187.5 3200~12500   100 4000 6 4250
HLHT100-LJ-250 ≤45 30.31~47.02 115.4~187.5 4000~16000   100 4000 6 5100
HLHT100-LJ-275 ≤45 36.92~58.19 107.1~166.7 5000~20000   100 4500 6 5500
HLHT100-LJ-300 ≤45 44.78~65.36 93.8~136.4 6300~20000   100 4600 6 5500
HLHT100-LJ-330 ≤45 54.85~79.20 88.2~125 8000~25000   100~150 4600 6 6400
HLHT100-LJ-410 ≤45 138 107 45000   150 5000 6 9000
HLHT110-WJ-71 ≤60 3.19~4.34 500~750 630~1600 600~1000   1000 10 1430
HLHT110-WJ-84 ≤60 4.63~6.77 500~750 1000~3200 600~1800   1250 10 1430~1730
HLHT110-LJ-100 ≤60 6.22~9.84 428.6~600 1250~5000 1000~3000   1500 10 2150~2600
HLHT110-LJ-120 ≤60 9.25~13.45 375~500 2000~6300 3000~5000   1750 10 2600
HLHT110-LJ-140 ≤60 13.34~19.29 300~428.6 3200~10000 3000~ 100 2000 10 2600~3250
HLHT110-LJ-160 ≤60 19.78~24.75 300~375 6300~12500   100 2500 10 3250
HLHT110-LJ-180 ≤60 23.18~32.27 250~375 6300~16000   100 2800 10 3250
HLHT110-LJ-200 ≤60 30.58~38.6 250~300 10000~20000   100 3400 10 4250
HLHT110-LJ-250 ≤60 44.13~60.21 187.5~250 12500~32000   100 4000 10 4250
HLHT110-LJ-300 ≤60 65.69~88.65 150~214.3 20000~50000   100~150 4600 10 5100~5500
HLHT110-LJ-330 ≤60 74.68~100.59 125~187.5 20000~50000   100~150 4600 10 5500~6400
HLHT120-LJ-84 ≤100 4.77~6.95 600~750 1600~5000 1000~1800   1250 16 1730
HLHT120-LJ-100 ≤100 6.94~10.16 500~750 2500~8000 1800~3000   1500 16 2150~2600
HLHT120-LJ-120 ≤100 9.61~14.98 375~600 3200~12500 3000~5000   1750 16 2150~2600
HLHT120-LJ-140 ≤100 13.6~19.98 333.3~500 5000~16000   100 2000 16 2600~3250
HLHT120-LJ-160 ≤100 17.54~27.8 300~428.6 6300~25000   100 2250 16 3250
HLHT120-LJ-180 ≤100 23~33.47 250~375 8000~25000   100 2500 16 3250
HLHT120-LJ-200 ≤100 27.25~43.10 250~375 10000~40000   100 2800 16 4250
HLHT120-LJ-250 ≤100 42.68~67.15 187.5~300 16000~63000   100 3400 16 5100
HLHT120-LJ-300 ≤100 63.11~92.3 150~250 25000~80000   100 4000 16 5500
HLHT120-LJ-330 ≤100 77.3~114.7 150~214.3 32000~100000   100 4500 16 6400
HLHT130-WJ-71 ≤200 1.63~2.2 750~1000 1000~2500 1000   800 25 1430
HLHT130-WJ-84 ≤200 2.2~3.42 600~1000 1250~5000 1000~1800   800 25 1730
HLHT130-LJ-100 ≤200 3.2~4.65 500~750 2000~6300 1000~1800   1000 25 2150
HLHT130-LJ-140 ≤200 6.26~9.1 375~600 4000~12500 3500 100 1300 25 2600
HLHT130-LJ-180 ≤200 10~14.61 300~428.6 6300~20000   100 1750 25 3250
HLHT130-LJ-200 ≤200 12.52~19.65 250~428.6 8000~32000   100 2000 25 4250
HLHT130-LJ-250 ≤200 19.2~30.91 214.3~300 12000~50000   100 2400 25 5500
HLHT130-LJ-300 ≤200 28.78~42.12 187.5~250 20000~63000   100 2800 25 5500
HLHT130-LJ-330 ≤200 35~51.5 166.7~250 25000~80000   100 2800 25 6400
HLHT140-WJ-71 ≤300 1.47~1.72 1000 1250~2500 600   800 40 1430
HLHT140-WJ-84 ≤300 1.84~2.69 600~1000 1250~4000 600~1000   800 40 1730
HLHT140-LJ-100 ≤300 3.12~3.62 750 3200~6300 1800   1000 40 2150
HLHT140-LJ-140 ≤300 6.06~9.85 500~750 6300~25000 3500 100 1300 40 2600~3250
HLHT140-LJ-180 ≤300 10.19~14.97 375~600 10000~32000   100 1600 40 3250
HLHT140-LJ-200 ≤300 12.12~19.23 333.3~500 12500~50000   100 2000 40 4250
HLHT140-LJ-250 ≤300 18.9~30.05 272.7~428.6 20000~80000   100~150 2000 40 5500
HLHT140-LJ-300 ≤300 28.17~38.13 250~333.3 32000~80000   150 2800 40 5500
HLHT140-LJ-330 ≤300 34.33~46.2 214.3~300 40000~100000   150 2800 40 6400
HLHT150-WJ-71 ≤400 1.1~1.29 1000 1000~1600 600   600 40 1430
HLHT150-WJ-84 ≤400 1.48~2.18 750~1000 1250~4000 600~1000   600 40 1730
HLHT150-LJ-140 ≤400 4.23~7.23 500~750 4000~20000 3500 100 1300 40 2600~3250
HLHT150-LJ-250 ≤400 13.11~22.43 250~428.6 12500~63000   100 2000 40 5500
HLHT150-LJ-300 ≤400 20.96~30.87 250~333.3 25000~80000   150 2000 40 5500
HLHT150-LJ-330 ≤400 23.77~39.03 214.3~300 25000~100000   150 2400 40 5500

Company 
Our company is an experienced manufacture and engineering Company in small scale hydro power equipment ( 100Kw to 50Mw). We play the role of manufacture and EPC contractor and could supply water to wire equipments and services. As turbine manufacture more than 60 years experience.
Our factory occupies 200,000 square meters of land, which includes 9 workshops, over 120 sets of heavy and precision producing and testing machinery; scientific research development center in the southern China, and various testing facilities. We have a general technical staff of 320 and 85 senior technical professionals. 
We provide customers with the complete package, from the design and manufacture of the turbine, generator and control equipment through to installation, commissioning and ongoing repair and maintenance.
1.Water Turbine Generator Unit Design & SUPPLY
2.Hydropower equipment supply 
3.Feasibility study of hydropower project
4.Manufacture
5.Installation & Supervision
6.Commissioning and Training service
7. Hydro power plant rehabilitant
8. Hydro power plant spares supply
9.Services
 
Our Services
Usually we guide the installation. We will dispatch engineers to site.(electrical engineer, mechanical engineer, control engineer and a translator according to requirement)
1.Water head:___M
2.Water flow:____M3/s
3.Frequency: 50HZ/60HZ
4.Generator outgoing line voltage:__Kv
5.On-grid or Off-grid type? (On-grid type voltage:____Kv)




Experience List (Part)
 
No. Name of Projects Turbine Type Capacity Year Generator model
1 Dongshen hydropower station HLY115-LJ-190
HLY115-WJ-78
4×8000KW
1×1000KW
2011 SF8000-22/4250
SFW1000-10/1430
2 Kuanpin Second stage hydropower station in Shangluo city,Shanxi province ZDJP502-LH-160
HLA551C-LJ-145
2×2500KW
1×1600KW
2012 Straight league
3 Ahebulong first-stage hydropower station project in Baicheng county,Xinjiang province HLA551c-LJ-150
HLA551c-LJ-110
2×6000KW
1×3400KW
2011 SF6000-16/3250
SF3400-12/2600
4 Xiahushan hydropower station in Anqin city HLA904a-LJ-142
HLA904a-WJ-73
2×6750KW
1×1500KW
2015 SF6750-16/3250
SFW1500-8/1430
5 Jueshan hydropower station upgrading project in Luoning city HLA616-LJ-140
HLA616-LJ-120
1×6500KW
2×5000KW
2014 SF6500-14/3250
SF5000-12/2600
6 Fuli hydropower station in Wuzhishan city,Hainan province HLA551C-LJ-130 3×1600KW 2015  
7 Liujiaogong hydropower station in Datian county,Fujian province HLM2540-LJ-122 2×12.5MW 2014  
8 Xinrong hydropower station project in Luolong county Xizang province HLA551C-LJ-120 4×1250KW 2015 SF1250-20/2600
9 Taolaihe hydropower station project in Gansu province HLA801-LJ-120
HLJF2504-LJ-100
2×6500KW
1×4000KW
2015 SF6500-12/2600
SF4000-10/2600
10 Kuitunhe seventh-stage hydropower station project of Jinbei power station in Kuitun county HLA551-WJ-120 3×4000KW 2014 SFW4000-14/2150
11 Shankou hydropower station upgrading project in Xiushui county HLA978-LJ-120 3×1600KW 2013 SF1600-20/2600
12 Henyuan hydropower development Co.,LTD in Zhenba county HLA685-LJ-120
HLA550-LJ-100
2×8000KW
1×5000KW
2011 SF8000-10/2600
SF5000-8/2600
13 Xiangzhu hydropower Company upgrading project in Xiushui county HLA551C-LJ-110 1×1600KW 2013 SF1600-16/2150
14 Guxiaodong hydropower Company in Pinli county,Shanxi province HLA551-LJ-110 1×4000KW 2011 Straight league
15 Jinjiang hydropower Co.,LTD in Dangchang county HLA551C-LJ-110
HLA551C-LJ-100
2×2000KW
1×1600KW
2010 stainless steel runner
16 Fendou reservoir project in Mulin city,Heilongjiang province HLA551C-LJ-104
HL551C-WJ-63
2×1700KW
1×600KW
2016 SF1700-14/2150
SFW600-10/1180
17 Nuer key water-control project in Cele county HLD307-WJ-102
HLA351-WJ-68
2×2850KW
1×500KW
2016 SFW2850-12/2150
SFW500-8/1180
18 Yudongzi hydropower station in Ningxia and Shanxi province HLA801-WJ-90
HL956A-WJ-76
1×3600KW
2×1500KW
2014 SFW3600-8/1730
SFW1500-8/1430
19 Puhuang Second-stage hydropower station in Gansu province  HLA551C-WJ-88 3×1250KW 2010 SW1250-12/1430
20 Keruian import and export project in Xinjiang province HLA801-WJ-60 2×1250KW 2014 SFW1250-6/1180
21 Daxinchuan hydropower station of Guodian electric power development co., LTD HLA551-WJ-75 1×500KW 2012 SFW500-12/1180
22 Shuangxi reservoir hydropower station in Sha county,Fujian province HLD307c-WJ-71 3×2000KW 2015 SFW2000-6/1430
 

 
Jiangsu Aerospace Hydraulic Equipments Co.,Ltd(JAHEC)
ADD:No.8 Bosideng Ave. Gaoyou, Jiangsu Province P.R.C.
TEL/FAX:+86 514 80955126
  
HTTP//:www.pumpcj.com