Negotiable
The date of payment from buyers deliver within days
Guangdong
Long-term effective
2017-12-16 14:58
31
Company Profile
Guangzhou Zhilv Aluminum Co., Ltd.By certification [File Integrity]
Contact:Mr. Mark(Mr.)
Email:
Telephone:
Phone:
Area:Guangdong
Address:Guangdong
Website: http://gzzhilv.better-elec.com/
Material | Aluminium alloy; 6063, 6061, 6082, 6005, T5, T6, |
Section Shapes | I, U, T, C, Z, L, H, square, round, flat, hollow, t-slot or other complicated shapes by custom design. |
Surface treating | Anodic Oxidation, Powder Spraying, Eletrophoretic Coating, Wood-grain Transfer, Fluorocarbon Spraying, Sand blast, Polished, Brushed |
Application | - for Window and door frames - for LED lighting Frame - for Building curtain glass walls - for Motor Shell - for Hook of LED Stage lighting - for Industry assembly lines equipment. - for Heat sinks, such as: LED lighting, Car Audio Shell, High-power LED Street lighting, LED tunnel lighting and so on. - other by custom design size and dimension |
Production lines | - 1)5 melting and casting production lines - 2)6 extruding production lines(from 600tons to 5000tons and meet different customer's demands) - 3)2 anodizing and electrophresis production lines - 4)2 powder coating production lines - 5)4 wooden grain production lines - 6)2 heat insulation broken bridge production lines - 7)2 wiredrawing and polishing production lines |
Characteristic Services | -OEM Service. -Design according to the customers' requirements. -More years' professional experience in research, manufacturing -Our modern deep processing center can provide machining such as Cutting, punching, drilling, CNC Machining etc. |
Quality Control | We operate the most strict quality control system, the detection is from the material, production process, To final product, and ensure the product quality and traceability. |
Process | Die design →Die making →Smelting& alloying →QC →Extruding →Cutting →Heat Treatment →QC →Surface treatment →QC →Welding →Packing →QC →Shipping →After Sale Service |
Standard | GB5237-2008 equal to EN12020-1.2(2001) |
Payment | T/T: 30% for deposit, the balance will be paid before or after shipment |
Packaging Detail | -Inside: Packed with plastic film to protect each piece -Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized request available |
Lead Time | -Die Developing and Sample testing: 10-12 days. -Mass Production: 15-25days. It depend on your quantity. |
Website | http://www.gzzly.com http://gzzhilv.en.made-in-china.com |